Democratic Republic Congo (DRC)

Multi-hazard Early Warning System Development & Implementation Center (MHEWC): A Global Platform for Multi-Hazard Early Warning Systems (MHEWS)-Modernizing EWS for the Global South

Created with Sketch.

Le MHEWC apporte un soutien technique à la Direction générale de la protection civile (DGPC) pour moderniser et automatiser les systèmes d’alerte précoce multirisques, les centres opérationnels d’urgence (COU) ainsi qu’un centre intégré de renseignement sur les risques, de commandement et de contrôle.

MHEWC Offers Technical Support to the Direction Générale de la Protection Civile (DGPC) to Modernize and Automate Multi-Hazard Early Warning Systems, Emergency Operations Centers (EOCs), and an Integrated Risk Intelligence Gathering System.

To,

Joseph Nkinzo Direction Générale de la Protection Civile (DGPC), République démocratique du Congo (RDC)

Subject: Proposal for Technical Cooperation and Partnership to Strengthen Multi-Hazard Early Warning Systems, Disaster Risk Governance, and Emergency Management Capacities 

Dear Sir,

Greetings from the Multi-Hazard Early Warning System Development and Implementation Center (MHEWC).

MHEWC is a specialized technical knowledge and solutions platform dedicated to strengthening climate and multi-hazard risk governance, disaster risk management, and integrated, end-to-end, people-centered early warning systems. Our expertise encompasses institutional capacity assessments, hydro-meteorological observation and monitoring networks, geospatial risk intelligence, ICT- and AI-enabled Decision Support Systems (DSS), impact-based forecasting, anticipatory action, and disaster preparedness, response, and recovery.

Effective disaster risk governance requires policy commitments to be translated into functioning systems and reliable services. International technical assistance and national investments should therefore connect policy development and institutional capacity building with practical system design, software development, data integration, deployment, maintenance, and operational use. This requires multidisciplinary technical expertise, including the appropriate application of machine learning and AI, to support timely, risk-informed decisions and actionable warnings for communities.

MHEWC is developing a hybrid ICT-based system designed to integrate real-time monitoring of hazardous weather and emerging threats, hazard detection and tracking, and landscape-level exposure and vulnerability information. The system aims to provide Emergency Operations Centers (EOCs) with actionable risk intelligence and support the automated dissemination of authorized warnings through the Common Alerting Protocol (CAP) to local authorities, frontline responders, and at-risk communities.

Recognizing the importance of strengthening national disaster risk management capabilities, MHEWC would welcome the opportunity to establish technical cooperation and a strategic working partnership with DGPC. Through this partnership, we propose to support comprehensive technical and institutional assessments, system development and deployment, and targeted capacity building, helping translate investments into operational systems, trained personnel, tested procedures, and effective warning and response services.

MHEWC can provide an integrated package of technical support, from project concept and funding proposal development to system deployment and operationalization. This includes preparing proposals for potential financing from most international donors, including the Green Climate Fund (GCF), the European Union (EU), the World Bank, the Asian Development Bank (ADB), AfDB, IDB, Australia’s Department of Foreign Affairs and Trade (DFAT), the United Kingdom’s Foreign, Commonwealth and Development Office (FCDO)/DFID, KOICA, JBIC/JICA, KfW, SIDA, CIDA, DANIDA, NORAD, Chinese development cooperation programmes, and other international financing partners. Proposals would be aligned with the National Adaptation Plan (NAP), Nationally Determined Contribution (NDC), and relevant local adaptation and mitigation priorities, while exploring complementary technical support through initiatives such as UNDP’s Climate Promise.

Our support can also cover designing, deploying, and operationalizing a national EOC system connected to relevant sectoral institutions, local authorities, and frontline responders. A nationwide risk intelligence network would bring together observation data, forecasts, exposure and vulnerability information, and field reports to support coordinated decisions and early action. This approach would strengthen disaster risk governance across climate-vulnerable productive sectors and essential services, contributing to food, water, health, and energy security, human safety, and climate-resilient economic development.

In collaboration with DGPC, relevant national hydro-meteorological institutions, sectoral ministries, local authorities, and other stakeholders, MHEWC is prepared to provide specialized technical assistance in the following priority areas:

1) Assessment and Modernization of Hydro-Meteorological Observation and Monitoring Networks

Conduct comprehensive technical diagnostics of existing hydro-meteorological observation stations and monitoring infrastructure, identify institutional and technological gaps, and develop a phased modernization and investment plan. This may include the technical design, installation, calibration, and integration of Automated Weather Stations (AWS), Internet of Things (IoT) sensors, and real-time environmental and hazard-monitoring technologies to strengthen the detection, tracking, and forecasting of potentially hazardous conditions.

2) Strengthening Integrated Multi-Hazard Monitoring and Early Warning Capacities

Assess existing monitoring, observation, forecasting, and early warning capabilities and support DGPC and relevant national meteorological and hydrological services in upgrading and integrating observation networks. This includes hybrid weather and hazard-monitoring systems, interoperable sensor networks, real-time data acquisition and transmission, and automated data ingestion into operational Decision Support Systems for multi-hazard monitoring, forecasting, and warning dissemination.

3) Modernization and Operationalization of the National Emergency Operations Center (EOC)

Undertake a comprehensive technical and institutional assessment of existing Emergency Operations Center facilities, operational procedures, communication systems, and information management infrastructure. Based on the findings, develop an EOC modernization roadmap and support the technical design, upgrading, and operationalization of an integrated National Emergency Operations Center and Situation Room.

The proposed EOC architecture would incorporate real-time hydro-meteorological observations, IoT-enabled monitoring networks, geospatial risk information, automated hazard tracking, impact-based forecasting, early warning dissemination, anticipatory action advisories, and coordinated emergency response management.

4) Development of ICT- and AI-Enabled Emergency Management and Decision Support Applications

Design and develop customized ICT- and AI-enabled applications to support automated hazard identification, real-time monitoring, predictive analytics, impact forecasting, emergency information management, and operational decision-making.

These solutions may include automated data processing, geospatial visualization, scenario-based impact analysis, threshold-based alert generation, emergency resource tracking, incident management, and decision-support workflows. AI-assisted outputs would be subject to appropriate technical validation and oversight by authorized national institutions.

5) Transformation of DGPC’s Web Portal into an Integrated Geospatial Decision Support Platform

Provide technical assistance to assess and upgrade DGPC’s existing web-based information systems into an integrated, geospatial, database-driven, and application-enabled Disaster Risk Information and Decision Support System (DRI-DSS).

We are currently developing a country-level Multi-hazard Risk Intelligence and DSS Command and Control Center that would be suitable for the Risk Intelligence Governance System. Please visit https://ccr.mhewc.org/ 

The platform would support real-time hazard monitoring, climate and multi-hazard risk information management, institutional coordination, preparedness planning, anticipatory action, emergency response, recovery management, and evidence-based decision-making across national and subnational administrative levels.

6) Development of National Climate and Multi-Hazard Risk Assessment Frameworks and Risk Information Repositories

Develop standardized methodologies, analytical frameworks, technical tools, and operational guidelines for conducting climate and multi-hazard risk and vulnerability assessments.

Technical assistance would include the preparation of GIS-based hazard, exposure, vulnerability, and risk maps; multi-sectoral risk profiles; climate and disaster risk scenarios; and the establishment of a centralized, interoperable national risk information repository and geospatial database management system.

7) Design and Operationalization of End-to-End, People-Centered Multi-Hazard Early Warning Systems

Support DGPC and relevant technical institutions in designing and implementing integrated, end-to-end Multi-Hazard Early Warning Systems (MHEWS), aligned with the four pillars of the Early Warnings for All (EW4All) initiative.

Priority interventions may include:

  • Hazard detection, monitoring, weather nowcasting, and forecasting services.
  • Impact-Based Forecasting (IBF) and Impact-Based Warning (IBW) systems.
  • Forecast-Based Financing (FbF) and anticipatory action mechanisms.
  • Development of hazard-specific triggers, Early Action Protocols (EAPs), and anticipatory response plans.
  • Common Alerting Protocol (CAP)-enabled warning generation and dissemination.
  • DSS-supported emergency preparedness, contingency planning, and response management.
  • Development of operational guidelines, Standing Orders on Disaster, and institutional Standard Operating Procedures (SOPs).
  • Strengthening last-mile warning communication, community preparedness, and coordinated early action.\

8) Integration of Climate and Disaster Risk Intelligence into Sectoral and Local Development Planning

Develop GIS-enabled databases, digital planning tools, and sector-specific risk information systems to support national ministries, government departments, municipalities, and local authorities in integrating climate and disaster risk considerations into development planning, public investment, and budgeting processes.

Technical assistance would focus on strengthening Disaster Risk Reduction (DRR), Climate Change Adaptation (CCA), Nature-Based Solutions (NbS), Locally Led Adaptation (LLA), resilient infrastructure planning, and climate-informed sectoral investment strategies.

9) Review and Strengthening of Multi-Hazard Preparedness, Emergency Response, and Recovery Plans

Review existing disaster preparedness, emergency response, contingency, and recovery plans at national, regional, municipal, and sectoral levels.

Support the development and upgrading of hazard-specific and multi-hazard operational plans, institutional coordination mechanisms, emergency communication protocols, resource mobilization procedures, and risk-informed recovery strategies consistent with DGPC’s mandate and national disaster management priorities.

10) Strengthening National-to-Local Disaster Risk Governance and Institutional Capacities

Provide specialized technical assistance to strengthen the institutional, regulatory, organizational, and operational foundations of disaster risk governance.

This may include institutional assessments, capacity development, stakeholder coordination frameworks, interagency information-sharing protocols, technical training, knowledge transfer, and the preparation of phased, costed implementation roadmaps to improve national and local emergency management capabilities.

11) Technical Support to Climate Change, Meteorological, Hydrological, and Disaster Management Institutions

Provide targeted technical support to DGPC, relevant climate change institutions, National Meteorological and Hydrological Services (NMHS), and other designated government agencies to strengthen climate information services, weather and climate monitoring, multi-hazard risk assessments, forecasting, early warning operations, climate resilience planning, and institutional technical capacities.

Such cooperation would be tailored to institutional requirements, existing technical infrastructure, priority hazards, and national development objectives.

Proposed Way Forward

MHEWC proposes initiating the cooperation through a joint technical consultation with DGPC to identify priority institutional and technological needs, review existing capacities, and determine potential areas for collaboration.

Based on DGPC’s priorities, we would welcome the opportunity to conduct an initial technical scoping and institutional capacity assessment, followed by preparing a practical, phased, costed technical cooperation and implementation roadmap.

Our approach emphasizes a one-stop services modality, least-cost and optimized technical solutions with national ownership, technology transfer, institutional sustainability, interoperability, and the development of operational systems that connect hazard observation and risk intelligence with timely warnings, informed decisions, and effective anticipatory action.

We would be pleased to arrange a virtual meeting with your technical and management teams at a mutually convenient time to discuss potential collaboration and identify immediate opportunities for technical support.

We look forward to your favorable consideration and the opportunity to contribute to strengthening national disaster risk governance, multi-hazard early warning, and emergency management systems.

Yours sincerely,

Z M Sajjadul Islam
Director & Advisor
Multi-Hazard Early Warning System Development and Implementation Center (MHEWC)

Website: https://www.mhewc.org/congo-the-democratic-republic/    http://www.glocs.org

Email: zmsajjad@gmail.com | sajjad@mhewc.org
Phone & WhatsApp: +88 01711 979179

                                            ———————————————————————————————————–

Climate, Multi-hazard, and Disaster Risk Profile of the Democratic Republic of the Congo

Country-level assessment | 19 November 2026

The Democratic Republic of the Congo (DRC) faces very high disaster and humanitarian risk. River flooding, flash floods and landslides repeatedly damage homes, infrastructure and farmland. In the east, these hazards overlap with armed conflict, displacement, disease outbreaks and, around Goma, volcanic and earthquake risk. The European Commission’s November 2026 humanitarian plan reports an INFORM Risk score of 8.1 out of 10, with 8.3 for hazard and exposure, 7.8 for vulnerability and 8.1 for lack of coping capacity. European Commission Great Lakes humanitarian plan

Climate and outlook

  • Rainfall varies across the country. The humid central Congo Basin typically receives 1,800–2,200 mm a year, with two rainfall peaks and little pronounced dry season. Farther north, rains generally fall from April to October. In the south, they generally fall from October to April, and the dry season can exceed five months in the southeast. The eastern highlands are cooler, with substantial local differences in rainfall. DRC’s 2026 national climate commitment, section 2.3
  • Warming is clearer than the direction of annual rainfall change. The DRC averaged 24.0°C and 1,638 mm of annual rainfall in 1995–2014. The World Bank estimates warming of 0.32°C per decade since 1970. Under the high-emissions SSP3‑7.0 scenario, models project median warming of 1.4°C in 2040–2059 relative to 1995–2014. Projected annual rainfall changes across the central 80% of models range from −68 to +150 mm. The IPCC projects more intense heavy rainfall across Central Africa with high confidence. World Bank Climate Change Knowledge Portal · IPCC regional assessment

Main hazards and hotspots

HazardExposure and documented impacts
River, lake and urban floodingKinshasa, settlements along the Congo River and its tributaries, and low-lying areas around Lake Tanganyika, including Uvira and Kalemie, face recurring floods. The November 2023–January 2024 floods affected more than 2.2 million people across 18 of 26 provinces, caused nearly 300 reported deaths and resulted in US$1.31 billion in estimated direct damage. In Kindu, Maniema, the IFRC preliminarily estimated that storms and flooding affected 35,000 people on 1 November 2026. World Bank flood assessment · IFRC Kindu update
Landslides and erosionSteep slopes around Lake Kivu and densely built areas with inadequate drainage are particularly exposed. In Kalehe, South Kivu, UNICEF reported 438 deaths after flash floods and mudslides in May 2023, with thousands still missing at the reporting date. Deep erosion gullies have also destroyed homes and displaced residents in cities including Kinshasa, Kikwit and Bukavu. UNICEF Kalehe situation report · Urban gully erosion study
Drought and extreme heatDry spells threaten rain-fed crops, especially in southern and central areas. The World Bank documented abnormal dryness across central and south-central provinces in 2026. Its long-term modelling identifies heat-related reductions in labour productivity as the largest economic impact channel, particularly relevant to outdoor work. World Bank October 2026 Economic Update · Country Climate and Development Report
Volcanoes and earthquakesGoma and the Virunga area are exposed to lava flows, volcanic gases and earthquake shaking along the East African Rift. The May 2021 Nyiragongo eruption caused 32 reported deaths and prompted an evacuation order covering an estimated 400,000–500,000 people in parts of Goma. USGS hazard assessment · IFRC eruption report
Disease outbreaksCholera is a recurring hazard where flooding, displacement and poor sanitation disrupt access to safe water. WHO recorded 54,009 reported cholera cases and 1,564 deaths from January through 27 September 2026. In the separate Bundibugyo Ebola outbreak, WHO reported 11,504 confirmed cases and 5,630 confirmed deaths in the DRC as of 16 November. Transmission remained intense in parts of Ituri and North Kivu, where insecurity complicates the response. WHO cholera surveillance · WHO Ebola update · WHO Africa situation report

Vulnerability and compounding risks

Poverty and displacement limit households’ ability to recover. The 2024 national household survey found 69.1% of people below the national poverty line. IOM’s July 2026 assessment identified 5.29 million internally displaced people, 67% of them in Ituri, North Kivu, South Kivu and Tanganyika. The revised 2026 UN humanitarian plan estimated 18.5 million people in need and targeted 10.7 million for assistance. World Bank Poverty and Equity Brief · IOM displacement assessment · UN Secretary-General’s report

Food insecurity is most severe in the east. The IPC estimated 28.8 million people in Crisis or worse for September–December 2026, including 3.6 million in Emergency. North Kivu, South Kivu and Ituri accounted for 10.4 million people in Crisis or worse. The IPC projects the national total to rise to 30.3 million in January–June 2027, citing conflict, displacement, Ebola, climate shocks, higher prices and declining humanitarian assistance. IPC October 2026 assessment and maps

Disaster risk management

The DRC adopted its 2025–2050 disaster risk management policy in late 2025 and submitted its 2026–2035 climate commitment in November 2026. Its priorities include multi-hazard early warning, resilient drainage and infrastructure, climate-resilient agriculture, safe water and disease surveillance. The US$200 million Urban Flood Resilience Project, approved in 2025, is expanding drainage and erosion control in Kinshasa and strengthening disaster preparedness. IMF policy review · DRC climate commitment · World Bank urban resilience update

Financing remains a major constraint. A January 2026 government–World Bank assessment estimated that floods and epidemics alone require an average of US$62 million per year in emergency response, compared with US$3.5 million in annual government allocations at the time. Over the longer term, the World Bank’s high-emissions scenario estimates that, without adaptation, 2050 GDP could be about 13% below a baseline without climate change. Disaster Risk Finance Diagnostic · Country Climate and Development Report, figure 4.1

 

Climate, Multi-hazard and Disaster Risk Profile – Democratic Republic of the Congo (DRC)

Nov 19, 2026 · @Z M Sajjadul Islam · MHEWC Country Profile Series

Risk at a glance

The DRC is one of the world’s highest-risk countries because three shock types now hit at once: climate-driven floods and landslides, record epidemics, and protracted conflict and displacement. Natural hazards rarely cause the highest death tolls on their own; it is their overlap with insecurity, unplanned urban growth and near-absent WASH services that turns ordinary rainfall into mass-casualty events.

Indicator

Value

Period / source

Land area

2.34 million km² (Africa’s 2nd largest country)

UNRIC 2026

Population

~113 million

OCHA HNRP 2026

People in need of humanitarian aid

14.9 million; 7.3 million targeted (US$1.4 billion)

HNRP 2026

Internally displaced / returnees

5.3 million IDPs and 4.1 million returnees

OCHA, Jan 2026

Acute food insecurity (IPC 3+)

26.5 million (Jan-Jun 2026); 30.3 million projected Jan-Jun 2027

IPC 2026

Ebola (Bundibugyo), 17th outbreak

11,376 confirmed cases, 5,568 deaths, 8 provinces

ECDC, data to 14 Nov 2026

Cholera, 2025

64,427 cases, 1,888 deaths, 17 of 26 provinces

UNICEF, Dec 2025

Projected warming (RCP8.5, median)

+1.7°C by 2040-2059; +3.5°C by 2080-2099

World Bank CRCP 2021

Climate cost without adaptation

4.7-13% lower GDP by 2050

World Bank CCDR 2023

Emergency response need vs. budget

~US$62 million a year needed (floods and epidemics) vs. US$3.5 million allocated

World Bank DRF Diagnostic 2026

Adaptation readiness

ND-GAIN rank 177 of 181

ND-GAIN 2020, via World Bank CRCP

Headline messages

  • Floods are the deadliest and most frequent natural hazard. Riverine floods on the Congo River, urban flash floods in Kinshasa, and flash floods with landslides on the Kivu-Tanganyika rift flanks recur almost every rainy season.
  • Epidemics are the largest mortality driver and are climate-sensitive. Cholera follows floods and water-system damage; the 2026 Ebola outbreak is the largest in the country’s history.
  • Conflict multiplies every hazard. It drives displacement into floodplains and steep slopes, blocks humanitarian and surveillance access, and fragments early warning.
  • The financing gap is structural. The government budget covers a small fraction of average annual response needs, and the response depends on humanitarian aid that fell sharply in 2025-2026.
  • Governance reform is under way but young. Two decrees in November 2025, the EW4All launch in January 2026 and a US$200 million flood-resilience operation create a window to build a national multi-hazard early warning system.

Country context

The DRC combines continental scale, a rainforest-and-river geography and extreme poverty, so exposure is wide and coping capacity is thin.

  • The country straddles the equator and holds about 62% of the Congo Basin. Rainforest covers roughly 59-70% of the territory. The western branch of the East African Rift runs along the eastern border through Lakes Albert, Edward, Kivu and Tanganyika, with active volcanoes north of Goma.
  • 26 provinces. Kinshasa is a megacity of an estimated 15-17 million people on the Congo River floodplain and surrounding hills.
  • Economy and livelihoods. Agriculture provides about 40% of GDP and 70% of employment, yet only about 10 million of 80 million hectares of arable land are cultivated. Around 98% of grid power is hydropower, while fuelwood and biomass meet about 90-95% of household energy needs.
  • The CCDR puts the poverty rate at 62.3%; the 2021 climate profile cites 73% extreme poverty (2018).
  • The state does not control all of its territory. M23/AFC took Goma in January 2025 and Bukavu in February 2025; a US- and Qatar-mediated DRC-Rwanda peace process advanced in 2025 but violence and displacement persist, and ISIS-linked ADF attacks on civilians rose in 2025.

Climate: current and projected

The DRC is warming at about 0.17°C per decade and its rainfall is becoming more intense and more erratic, even though annual totals are not projected to change much. That combination – heavier downpours, longer dry spells – is exactly what drives the country’s floods, landslides, cholera and crop losses.

Current climate (1991-2020 baseline)

  • The seasonal migration of the Intertropical Convergence Zone (ITCZ) across the equator drives the climate.
  • Mean annual temperature is 24.1°C (mean maximum 29.7°C, mean minimum 18.5°C). The north, centre and south-west, including Kinshasa, average 24-25°C; the south and south-east 22-23°C.
  • Mean annual rainfall is about 1,508 mm. The equatorial zone receives 1,600-2,000 mm with rain all year; the Atlantic coast about 800 mm.
  • Seasons differ by zone: two rainy seasons in the northern forest (March-May, September-December); one long wet season (about October/November-March/April) and a pronounced dry season south of the equator. The Kivu-Tanganyika rift typically has rains in September-January and March-May.
  • Observed warming was 0.05°C per decade over 1901-2013, rising to about 0.17°C per decade over the last 30 years. The observation network is sparse, which weakens both trend analysis and rainfall projections.

Projected change

Parameter

Projection

Implication for risk

Mean temperature (RCP8.5, median)

+1.7°C (range +1.2 to +2.4) by 2040-2059; +3.5°C (+2.7 to +5.1) by 2080-2099

Heat stress on people, crops and livestock; higher evaporation

Hot days / hot nights

+13-58% hot days; +33-86% hot nights by 2100

Urban heat in Kinshasa and other cities; health burden

Annual rainfall

No significant change in the median

Averages mask the real shift

Rainfall variability

More rain concentrated in the October-April wet season; longer dry spells

Flash floods and drought in the same year

Heavy rainfall intensity

Up to +27%

More urban flash floods, landslides, gully erosion

Malaria

Cases in already-endemic areas could triple by mid-century; 65,000-80,000 more people newly exposed

Higher health load on a weak system

Crops

Heat stress cuts yields of beans, plantain, soy and coffee; rice may gain in Kivu

Food insecurity in an already IPC 3+ population

Signals already visible

  • ClimaMeter found that the rainfall behind the May 2025 Kasaba floods on Lake Tanganyika was locally intensified by human-driven climate change.
  • Lake Tanganyika had retreated about 150 m at Uvira since 1964, then reclaimed its shores in 2023-2024, flooding homes and roads.
  • The Congo River reached 6.20 m at Kinshasa in January 2024, just below the 1961 record of 6.26 m.

Hazard profile

Floods, landslides and epidemics carry very high risk nationally; volcanic, limnic-gas and seismic hazards are geographically concentrated around Goma and Bukavu but could cause mass casualties in a single event. Risk ratings below are an MHEWC qualitative assessment combining likelihood, exposure and recent impact.

Hazard

Main areas

Season / trigger

Recent evidence

Climate trend

Risk

Riverine flood (Congo and tributaries)

Kinshasa, Mbandaka/Équateur, Maniema (Kindu), Tshopo, Kasai rivers

Dec-Jan peak on the Congo; local tributary peaks

Jan 2024: river at 6.20 m in Kinshasa; ~300 dead and 300,000 households affected nationally; national catastrophe declared

Increasing with heavier rain

Very high

Urban flash flood

Kinshasa (N’djili, Ngaliema, Limete), Bukavu, Uvira, Kalemie, Kananga

Intense storms, often overnight

Apr 2025 Kinshasa: 13 of 24 communes hit; June 2025: 29 dead in Kinshasa

Increasing (+27% heavy-rain intensity, urban sprawl)

Very high

Flash flood and debris flow on rift flanks

Kalehe, Fizi, Uvira (South Kivu), Ituri highlands

Mar-May and Sep-Jan rains

May 2023 Kalehe: 400+ dead; May 2025 Kasaba: 62+ dead, 50 missing

Increasing

Very high

Lake-level flooding

Lake Tanganyika shore (Uvira-Kalemie-Moba), Lake Albert (Ituri), Ruzizi plain

Multi-year high rainfall

2024 Uvira: 4,500 houses collapsed, 53 schools flooded

Increasing variability

High

Landslides and gully erosion

West Kivu rift flank (2,730 mapped landslides), Bukavu, Kinshasa hills

Saturated soils; roads, mining, deforestation

Recurrent deaths; wall collapses cause most Kinshasa flood deaths

Increasing

High

Drought and dry spells

Haut-Katanga, Lualaba, Tanganyika, Haut-Lomami, Kasai

El Niño years; delayed onset

2024 rainfall deficits; maize losses in Manono, Moba, Kasenga, Pweto

Longer dry spells

Medium-high

Extreme heat

Kinshasa, northern Ubangi and Uele, Haut-Katanga

Dry season; El Niño

+1 to +3°C maximum-temperature anomalies in late 2024

Strongly increasing

Medium, rising

Volcanic eruption

Nyiragongo and Nyamulagira (Goma, Nyiragongo territory)

Fissure eruptions with little precursor signal

May 2021: ~31-37 dead, ~450,000 temporarily displaced

Not climate-driven

High (low frequency, catastrophic)

Limnic gas release

Lake Kivu (Goma, Bukavu, Gisenyi)

Magma intrusion or lava entry into the lake

2021 dike reached under Goma and the lake

Not climate-driven

Low likelihood, catastrophic

Earthquake

Kivu and North Tanganyika rift

Tectonic

Mw 6.0 near Bukavu, Feb 2008

Not climate-driven

Medium-high in the east

Epidemics

Nationwide; cholera hotspots along lakes and rivers; Ebola in the north-east

Floods, WASH collapse, displacement, mobility

2025 cholera worst in 25 years; 2026 Ebola largest ever

Increasing (floods, heat, malaria)

Very high

Forest loss and fire

Tshopo, Mai-Ndombe, Kwilu, Kasai

Shifting cultivation, charcoal, fire

Record 590,000 ha primary forest loss in 2024

Increasing

High (long-term driver)

Storms, wind and technological hazards

Nationwide; mining belt (Katanga, Kivu)

Convective storms; tailings, industrial sites

Listed by UNDRR as national hazards

Storms increasing

Medium

Major events, 2021-2026

Since 2021 the DRC has had at least one nationally significant hydro-meteorological disaster every year, and since 2024 an epidemic emergency running in parallel. Newest first.

Date

Event

Location

Impact

May 2026 – ongoing

Ebola (Bundibugyo virus), 17th outbreak; WHO PHEIC

Ituri, spreading to 8 provinces

11,376 confirmed cases, 5,568 deaths (to 14 Nov 2026); exported cases to Uganda, Kenya, Nigeria

1 May 2026

Kalimabenge River flash flood; parallel floods in Kindu

Uvira (South Kivu); Kindu (Maniema)

~96,000 people affected across both (IFRC DREF); ~62,000 affected and 900+ homes destroyed in Kindu

Sep – Dec 2025

Ebola (Zaire), 16th outbreak

Bulape, Kasai

64 cases, 45 deaths; ended 1 Dec 2025

Jan – Dec 2025

Cholera, worst in 25 years

17 of 26 provinces incl. Kinshasa

64,427 cases, 1,888 deaths; children ~23% of cases

14-15 Jun 2025

Dry-season flash flood, blocked drainage canal

Kinshasa (Ngaliema)

29 dead; thousands of homes destroyed

8-9 May 2025

Kasaba River flash flood

Fizi (South Kivu), Lake Tanganyika shore

62 dead and 50 missing initially; Caritas later reported 104 dead

4-11 Apr 2025

N’djili River overflow, floods and landslides

Kinshasa, 13 of 24 communes; Kongo Central

33 dead in the first days; IFRC later recorded 165 deaths and 7,000+ displaced across the 2025 Kinshasa floods

Jan – Feb 2025

M23/AFC capture Goma and Bukavu

North and South Kivu

IDPs peaked at 7.3 million by April 2025

Apr – May 2024

Lake Tanganyika rise and river overflow

Uvira, Kalemie, Moba

4,500 houses collapsed, 7,000+ households affected, 53 schools flooded in Uvira

Aug 2024

Mpox clade Ib emergence; WHO PHEIC

South Kivu, then nationwide and regional

27,317 confirmed cases, 68 deaths (Jan 2024 – Jul 2025)

Nov 2023 – Jan 2024

Congo River near-record flood

Kinshasa and more than a dozen provinces

~300 dead, 300,000 households affected; hydrological catastrophe declared

2-5 May 2023

Flash floods and landslides

Kalehe (Bushushu, Nyamukubi), South Kivu

401 dead (governor), thousands missing, 100,000+ displaced

Dec 2022

Urban floods and landslides

Kinshasa

120+ dead

22 May 2021

Nyiragongo flank eruption without clear precursors

Goma

~31-37 dead, ~450,000 temporarily displaced, ~3,000 homes destroyed

Exposure and vulnerability drivers

Vulnerability, not hazard intensity, explains most DRC disaster deaths: a night of heavy rain kills dozens in Kinshasa because of where and how people are forced to live.

  1. Conflict and displacement. OCHA counted 5.3 million IDPs and 4.1 million returnees in early 2026, down from a record 7.3 million IDPs in April 2025. Displaced families settle in floodplains, ravines and overcrowded sites; host communities absorb the shock. Insecurity blocks access for relief, surveillance and warning dissemination.
  2. Food insecurity and malnutrition.5 million people (23% of the analysed population) were in IPC Phase 3+ in January-June 2026, including 3.6 million in Phase 4. Some 4.18 million children under five need treatment for acute malnutrition, 1.3 million of them for severe acute malnutrition.
  3. Water and sanitation. About 50 million people lack safe water and 80-90% lack improved sanitation. Floods damage what little exists, which is why cholera surges follow floods.
  4. Unplanned urban growth. Kinshasa’s deaths come mostly from collapsing walls and homes in unplanned settlements on floodplains and steep slopes. Riverbeds such as the N’djili have been narrowed by construction and waste; in June 2025 a blocked drainage canal flooded Ngaliema in the dry season.
  5. Land degradation and forest loss. The DRC lost a record 590,000 ha of primary forest in 2024, the third-largest absolute loss globally. Road cuts, mining and deforestation drive many of the 2,730 landslides mapped on the rift flank west of Lake Kivu.
  6. Health-system fragility. Many Ebola deaths occur outside treatment centres: WHO counted 335 community deaths out of 512 recorded between 21 October and early November 2026. Children make up more than a quarter of confirmed Ebola cases and a third of deaths.
  7. Shrinking humanitarian funding. The 2025 appeal received less than a quarter of US$2.5 billion. The 2026 plan was cut to US$1.4 billion for 7.3 million of 14.9 million people in need.
  8. Differentiated vulnerability. Children carry about 23% of cholera cases. In North Kivu, OCHA found 91.2% of female heads of household with poor food consumption. Persons with disabilities, older people and Indigenous forest communities are rarely reached by warnings designed for urban, French-speaking audiences.

Hazard Risk 

The Democratic Republic of Congo (DRC) is exposed to a number of hazards including volcanic and limnic eruptions, earthquakes, flooding, and drought. Vulnerability to these hazards is exacerbated by poverty and political insecurity. Since 1997 countless millions of people have been plunged into acute vulnerability due to displacement, loss of economic livelihoods, and a destroyed social fabric.  

Two volcanoes of the Virunga volcanic chain are among the most active volcanoes in the world and pose a direct threat to more than one million inhabitants in the city of Goma and surrounding areas. In 2002, a volcanic eruption covered 13 percent of the city’s surface area and destroyed 80 percent of the local economy.   

The DRC also experiences extreme weather and climate variability, resulting in high exposure to floods and droughts. The impacts of climate change are projected to increase both the frequency and severity of these events.  

National Priorities  

The Government of the DRC is currently working with the United Nations Development Program (UNDP) to develop the country’s first disaster risk reduction policy. The country’s latest Poverty Reduction Strategy (2013) includes climate adaptation as one of its core pillars and disaster risk management (DRM) considerations. However, there is no tracking of the government’s budget for disaster risk reduction.  

To further advance the DRM agenda, priorities include:  

  • Improving capacity to monitor and forecast hazards and transfer improved knowledge into decision making and planning;  
  • Strengthening early warning systems and contingency planning; and,  
  • Strengthening institutional capacity for DRM.  

GFDRR progress to date

GFDRR’s engagement in the DRC began at a regional level in 2014. Ongoing regional projects are focused on strengthening the DRM capacity of the Economic Community of Central African States (ECCAS). To date, activities have included supporting ECCAS to coordinate training in the DRC. The training included a review of national DRM policies and identifying national DRM expertise and capacity building needs. This engagement helped the government to strengthen risk identification and preparedness in the Goma region and improve hydromet services as key DRM priorities.   

At a country level, GFDRR’s ongoing efforts are helping the Government of DRC advance DRM by: 

  • Strengthening institutional capacity to better manage natural disaster risk, particularly those related to volcanic activities, in the region of Goma through improved risk assessment, contingency planning, and community preparedness; and, 
  • Improving the quality of hydromet services through modernized observation and forecasting infrastructure, better information service delivery, and stronger institutional and regulatory capacity.  

Both of these engagements are in the early stages, and GFDRR anticipates continued demand from the Government of DRC in these areas.

At Least 22 Killed after Heavy Rains Flood Congo’s Capital

 People walk through the flooded streets of Kinshasa, Democratic Republic of Congo Sunday, April 6, 2025. (AP)

People walk through the flooded streets of Kinshasa, Democratic Republic of Congo Sunday, April 6, 2025. (AP)

Major flooding in the Congolese capital of Kinshasa has killed at least 22 people and cut off access to over half of the city and the country’s main airport, authorities said Sunday.

Most of the fatalities in Friday’s deluge were caused by collapsing walls, said a provincial health minister, Patricien Ngongo.

The flooding had damaged the main road leading to the airport, but it has been reopened to light traffic and within 72 hours would be opened to all traffic, said Kinshasa Gov. Daniel Bumba.

The road also links Kinshasa to the rest of the Congo and officials worry about the impact on trade.

“We’ve been here since nightfall, but we’re not making any progress, because we’ve been told that the road is cut in two, and we have goods that we’re going to pick up,” said Blaise Ndendo, a truck driver.

In 2022, at least 100 people were killed during similar flooding in Kinshasa.